Drainage of rainwater in Al-Tayseer area
The project is a part of the rainwater drainage initiative which is among the initiatives to implement the Kingdom’s 2030 vision and include Execution of rainwater disposal networks and urgent solutions to reduce the level of surface water for the Al-Tayseer area ( part one ) in the area between Palestine Road ( North ) , King Abdullah Road ( South ) , Alharmain Road ( West ) & Jeddah Eastern Mountainous area .
WORK AREA:
- Earth Works ( Excavation & Backfilling ) total Quantity over 150,000 M3 .
- Box Culvert Works total length is 2.3 K.M.
- Main Pipes type are :FRP total length is 4.6 KM, RCP total length is 4.2 KM and Perforated PVC total length is 8.5 KM
- U Channels
- Asphalt Works.