Design and construction of phase one for Jeddah Economic City, within a period of six months. The work consists of: Soil work, irrigation system and accessories, kerb stone work, planting of palm trees and trees, tile works for the external sidewalk, road marking work, sign boards, traffic light, part of the electric poles, and the adjacent external sidewalk with Jeddah Municipality.