The project comes within the aims of the Kingdom’s vision 2030 and includes the implementation of rainwater drainage networks and
solutions to reduce the sub-surface water level of Al-Asala neighborhood in Jeddah in the area between Al-Haramain Road
from the north and east and Prince Talal bin Mansour Road from the south and Medina Road from the west. The works are divided as follows:
1 – Earthworks (cutting and filling) in quantities of more than 100 thousand cubic meters.
2 – A U-shaped rainwater drainage channel, length of 983 m.
3 – Implementation of a rainwater drainage network with all its accessories, such as manholes and rain traps, with a length of more than 7000 meters.
4 – Implementation of a network for reducing the sub-surface water level with all its accessories, with a length of more than 7000 meters.
5 – Executing a Lift station to drain water from networks to the open channel.
6- The asphalt and base course layers to improve the efficiency of streets and roads in the district.
The project site is Al-Asala district – opposite Al-Jawhara Stadium.