Projects

Sewage treatment plant in Khyber Governorate

Work Area:

  • Civil ,Mechinical & Electrical Works for Sewage treatment plant  6000m3 capacity
  • Aeration tanks
  • Sedimentation tanks
  • Filters

 

Client: General Directorate of Water in Almadinah Almunawrah Region Head Office.

Sewage treatment plant in Badr and Al-Ula governorate

Work Area:

  • Civil ,Mechinical & Electrical Works for Sewage treatment plant  8000m3 capacity
  • Aeration tanks
  • Sedimentation tanks
  • Filters

 

Client: General Directorate of Water in Almadinah Almunawrah Region Head Office.

Indigo Beach Resort Jeddah

Indigo 2” project in Northern Jeddah. The project is landscaping works, beautification, irrigation works, water features, waterfall and river walkways, speaker system in landscape areas, and lighting for plants.

Darb Al-Haramain

In Darb Al-Haramain’s project, SALCO signed a 100 million SR. contract with Saqeefat Safa Co. for the development of one million m2  of land in Al-Sulaimaniya area, which located in the East of Jeddah.

https://etqaan.sa/darb_alharamain/

Drainage of rainwater in Al-Tayseer area

The project is a part of the rainwater drainage initiative which is among the initiatives to implement the Kingdom’s 2030 vision and include Execution of rainwater disposal networks and urgent solutions to reduce the level of surface water for the Al-Tayseer area ( part one ) in the area between Palestine Road ( North ) , King Abdullah Road ( South ) , Alharmain Road ( West ) & Jeddah Eastern Mountainous area .

 

    WORK AREA:

    • Earth Works ( Excavation & Backfilling ) total Quantity over 150,000 M3 .
    • Box Culvert Works total length is 2.3 K.M.
    • Main Pipes type are :FRP total length is 4.6 KM, RCP total length is 4.2 KM and Perforated PVC total length is 8.5 KM
    • U Channels
    • Asphalt Works.